T5.1: Test plan preparation [M4-M5, M11-M12, M30-M31]

The objective of this task is to elaborate the test plans to be used on the different testing activities to be accomplished throughout WP5. During the first iteration, relevant specifications tailored to the needs of the current device construction will be used to define an evaluation test plan for the current technology to be performed in task T5.3. Additionally, a qualification test plan for the L/S band POI based SAW filters and a test plan for the preliminary evaluation of the advance POI technology will be drafted. The results of the technology evaluation in T5.3 will be used to adjust the test conditions of the qualification in task T5.4, if necessary, during the second iteration of this task. In the third phase of this task, the draft of the tests to be completed on task T5.5 will be consolidated in line with the findings of previous completed tasks in this WP as well as in WP3. The test plans will include detailed test flows as well as the test conditions to be applied considering the overall specifications detailed in WP1. This task will be conducted by ALT and all other partners will review and provide inputs to properly address the space requirements as well as the technology limits applicable for the different devices under test.
Leader : ALT
Involved Partners : UCL, INC, TAS, SOI